How to Apply for, Install and Operate DG on United's System
If you would like to install and operate DG on the United system, we recommend
you review the following:
- Review United's DG
Packet before purchasing a system. This packet covers all the requirements
for DG system interconnection at United and includes an application form.
- Review the costs of DG equipment. Besides the initial cost, items such
as annual operation costs, maintenance costs, insurance costs, and available
incentives (ie tax credits for renewable systems) should be considered. When
all costs and applicable incentives are taken into consideration, most DG
installations will not be competitive with United rates. A good starting
place for incentive information is the DSIRE website.
Generic DG system pricing information can be found below in the section "What
Does DG Cost".
- Review the Capital
Cost Recovery Analysis handout published by the Cooperative Research
Network. This may assist you in determining the payback of your investment
in DG.
- If you are interested in wind generation, review the document Ten
Steps to a Small Wind System document published by the Cooperative
Research Network.
- Research the available DG energy sources that interest you and then locate
local reputable vendors that sell, install, and maintain the DG source you
choose. Make sure that prior to any purchase, you have applied with United
to interconnect and have met all requirements.
- Upon receipt of the application, application fee, and other required documentation,
United will review for approval. If application is denied, United will provide
information as to the requirements for approval. Along with the approval,
United will provide a cost of interconnection for further studies, if necessary,
and for physical interconnection.
- Once approval is obtained by United, the appropriate Interconnection Agreement
shall be executed and any integration costs due to United shall be paid prior
to implementation.
- Prior to physical interconnection of DG, a United representative will inspect
for proper operation and installation.