If you would like to install and operate DG on the United system, we recommend you review the following:

  • Review United's DG Packet before purchasing a system. This packet covers all the requirements for DG system interconnection at United and includes an application form.
  • Review the costs of DG equipment. Besides the initial cost, items such as annual operation costs, maintenance costs, insurance costs, and available incentives (ie tax credits for renewable systems) should be considered. When all costs and applicable incentives are taken into consideration, most DG installations will not be competitive with United rates. A good starting place for incentive information is the DSIRE website. Generic DG system pricing information can be found below in the section "What Does DG Cost".
  • Review the Capital Cost Recovery Analysis handout published by the Cooperative Research Network. This may assist you in determining the payback of your investment in DG.
  • If you are interested in wind generation, review the document Ten Steps to a Small Wind System document published by the Cooperative Research Network.
  • Research the available DG energy sources that interest you and then locate local reputable vendors that sell, install, and maintain the DG source you choose. Make sure that prior to any purchase, you have applied with United to interconnect and have met all requirements.
  • Upon receipt of the application, application fee, and other required documentation, United will review for approval. If application is denied, United will provide information as to the requirements for approval. Along with the approval, United will provide a cost of interconnection for further studies, if necessary, and for physical interconnection.
  • Once approval is obtained by United, the appropriate Interconnection Agreement shall be executed and any integration costs due to United shall be paid prior to implementation.
  • Prior to physical interconnection of DG, a United representative will inspect for proper operation and installation.

Distributed Generation Interconnection and Parallel Operation Requirements Contact:

Ed Nunez Jameson Parker
Business Development/Key
Accounts Manager
Electrical Engineer
email: ed@united-cs.com email: jameson@united-cs.com
phone: 817-447-9292 phone: 817-556-4000

 

 

Quick Links

Co-op Connection Card